02
West 11th Townhouse
Greenwich Village, New York
Architecture + Interior Design
2025
6,800 sq ft
Citgroup & Vale
A nineteenth-century Greenwich Village townhouse reimagined as a quiet contemporary home while preserving the proportions, craftsmanship, and character of the original structure.
Natural oak
The original floorboards were taken up, numbered, and relaid in a darker, quieter finish than the client expected — until the house was lived in. The oak needed time, and time was allowed.


Travertine
Travertine is used where guests touch the house most: stair landings, bathroom walls, the entrance coatroom. Honed, never polished, so that the stone ages with use rather than against it.
Plaster walls
The principal rooms were re-plastered by hand in lime. Heated floors behind plaster walls — walls that breathe, that take light softly, that hold the temperature of the room.


Historic molding
Moldings were repaired in place rather than replaced. Where a run was missing, a plaster shop cast from the surviving original so the new length carries the same profile and shadow line.


Custom millwork
Every built-in is bespoke. Cabinetry was drawn at full scale against the rooms they sit in — each piece tuned to the neighboring floors, moldings, and the height of the light.
Natural light
The house was opened front to back on every floor. Foursouth-facing windows pull light to the garden wall; the stair hall borrows from the rooms around it, and the house moves with the sun.

Material restraint
The discipline was subtraction: oak, travertine, plaster, and paint, applied generously but held to a strict family of materials. Whatever might compete with the architecture was left out.

Completion
West 11th Townhouse was completed in 2025. The project was delivered with the studio’s in-house team of architects, interior designers, and craftspeople, working alongside the client and a carefully selected group of builders and fabricators.